Connecting new software to the systems you already have
Two integrations is not twice the work of one. Each connection is a small project with its own failure modes, its own owner and somebody else's release schedule attached to it.
8 min read

Nobody buys software to replace everything. There is an accounting system that works, a payroll provider nobody wants to change, a warehouse tool somebody chose for good reasons, and a bank. The new thing has to live among them.
Which is why integrations are where estimates quietly fail. They look like plumbing — move a record from here to there — and they are the part of a build where the questions are least technical and most about agreement between parties who have never spoken.
What an integration actually is
Describing one as "connect to the accounting system" hides five decisions, each of which somebody has to make.
- Which direction data moves, and whether both ends may change the same record. One-way is a straightforward job. Two-way is a different category of problem, because it needs a rule for what happens when both sides edited.
- Which system is the authority for each field. When the two disagree about a customer's address, one of them is right by policy, and that policy has to exist before the code can.
- When it happens. Immediately, every few minutes, or nightly. This is usually a business decision dressed as a technical one, and "immediately" is considerably more expensive than "within the hour".
- What happens when it fails. Not if. A connection will be unavailable during a release, a credential will expire, a record will be rejected for a reason nobody anticipated. Where does that land, and who finds out?
- How anyone proves it worked. A reconciliation someone can run, rather than confidence that nothing was reported.
An integration without a stated failure path is not finished. It is working for now, which is a different thing, and nobody will discover the difference until the day it matters.
The four ways integrations go wrong
These are predictable enough to plan for, and all four are cheaper to prevent than to find.
Silence that looks like success
The worst failure mode in the set. A sync stops, nothing errors visibly, and the receiving system simply stops hearing about new records. Everything looks normal for a fortnight because an empty result is indistinguishable from a quiet week. The fix is cheap and almost always skipped: alert on the absence of expected traffic, not only on errors. That is the same argument as monitoring what a customer experiences rather than whether a server responds, which is in post-launch software support.
Partial writes
Half a transaction arrives. An order is created and its lines are not, or stock moves and the ledger entry does not. The two systems are now both confidently wrong in a way that no single report reveals, and the discrepancy is found by a person months later.
Duplicates after a retry
A request times out, the sender retries it, and the receiver had actually processed the first one. Now there are two. This is solved by making every operation safe to repeat, which is a design decision taken at the start or an incident taken later.
A third party changing something
A provider deprecates a field, tightens a rate limit, or ships a new version with ninety days' notice sent to an inbox nobody reads. Your system did not change and stopped working anyway. Somebody has to own watching for this, and that ownership belongs in the arrangement rather than in goodwill.
Questions to settle before anyone writes code
Per integration, not per project. Six answers, and the first two are not technical at all.
- 01Who at the other end can answer a question? A named person or a support queue with a stated response time. An integration with nobody to ask is a research project.
- 02Is there a sandbox, and can we have credentials now? Day one, not the week it is needed. Access delays are the most common reason an integration slips, and they are entirely administrative.
- 03Which system wins, per field? Write it down field by field for anything that can be edited at both ends.
- 04How fresh does this actually need to be? Ask what decision depends on the data. The answer is frequently "by tomorrow morning", which removes a great deal of cost.
- 05Where do failures go, and who is responsible for clearing them? A queue nobody owns is a queue nobody empties.
- 06What is the reconciliation? A report somebody can run that shows both sides agree, and a stated cadence for running it.
If you are assembling a scope, these belong in it per connection. How to write a software scope covers the rest of that document, and the reason integrations are priced separately is covered in what a custom ERP system costs.
Why the count matters more than the complexity
A single integration is a task. Four are a programme, because the work is not in each connection but in the relationships between them. With four systems in play there are rules about which one is authoritative for overlapping data, an order in which things have to happen, and a question about what the whole set does when one member is unavailable.
This is why adding "and connect it to payroll as well" during a review is never small, and why it should move the date rather than being absorbed. It is one of the most common causes of a timeline failing on arithmetic, which is covered in how long custom software takes.
What good looks like in practice
A finished integration has four properties, and you can check each of them without reading any code.
- It can be repeated safely. Running the same thing twice does not create two of anything.
- It is observable. Somebody can see, today, when the last successful exchange happened and how many records moved.
- It alerts on silence. Not just on errors, because the dangerous failure is the quiet one.
- It can be reconciled. There is a report that proves both sides agree, and a person whose job it is to look at it.
None of that requires a large budget. It requires the four things being decided deliberately at the start rather than discovered in production. Deployment, monitoring and the support arrangement that keeps watch over all of it are part of what we build and run.
Questions we get asked
Frequently asked
- Why are integrations priced separately from modules?
- Because they do not scale with the rest of the build. A module's cost follows its screens and rules; an integration's cost follows somebody else's system, their documentation, their rate limits and their availability to answer questions. Two integrations is not twice one, because the work is also in deciding which system is authoritative for data that exists in both.
- Do we need real-time syncing?
- Usually less often than assumed, and it is worth asking what decision actually depends on the data. If somebody acts on it the next morning, nightly is sufficient and considerably cheaper to build and to operate. Real-time is justified when a person or a customer is waiting on the result, and it brings failure handling that batch processing does not need.
- What happens when the other system goes down?
- It should be a designed behaviour, not a surprise. Work queues up and is retried, the queue is visible to somebody, and operations are built so a retry cannot duplicate anything. The failure to avoid is the silent one, where a connection stops and nothing reports it because no errors are being produced — alerting on the absence of expected traffic is what catches that.
- Can you integrate with a system that has no API?
- Often, through scheduled file exchange, a database view, or a vendor's import format. It is more fragile than an API and more dependent on nothing changing at the other end, so it needs reconciliation and monitoring rather than trust. Where a vendor offers no supported route at all, that constraint is worth knowing before it becomes a line in a scope.
- Who is responsible when a third party changes their API?
- Somebody has to be, by name, and it should be written down. A provider deprecating a field or tightening a limit will break a system that did not itself change, and the notice usually arrives by email to an address nobody monitors. Watching for that, and acting on it, is part of a support arrangement rather than something that happens by goodwill.